BBC

A 250 turbine wind farm planned to be built about 10 miles offshore in Wales has just been approved. The project will (hopefully) begin feeding electricity to the grid in 2012, and will have a peak power production of 750 MW, enough to power around 680,000 Welsh homes.

A 250 turbine wind farm planned to be built about 10 miles offshore in Wales has just been approved. The project will (hopefully) begin feeding electricity to the grid in 2012, and will have a peak power production of 750 MW, enough to power around 680,000 Welsh homes.

The town of Santa Coloma de Gramanet near Barcelona in Spain wants to do its part in fighting global warming. But the densely packed town - 124,000 people crammed into 1.5 square miles - doesn't have enough land to dedicate tracts exclusively to the wind farms or solar panels that could help ease residents' dependency on fossil fuel.

An iPhone 3G commercial in the U.K. won't get any more air time now that the Advertising Standards Authority (ASA) has blocked the ad over complaints that it is misleading.

The agency apparently received 17 complaints claiming Apple was misrepresenting the combination iPod and smartphone's Internet performance, according to BBC News.

The commercial in question stated that the iPhone's Internet performance was "really fast," and showed a Google Maps page loading in less than a second. The commercial also displays the text "Network performance will vary by location."

Tags:

Tags:

Trains dawdle and trains go down hills. Those two basic factors in train travel are big energy wasters, yet they have many major selling points. This drives thinkers to come up with better systems.

Use light-bending materials to slow and separate light signals, and thus speed up the Internet. That's the advice of some scientists, who are saying that new materials that can potentially render objects invisible could also help the Net overcome its most persistent bottlenecks.

Jet, Hand-Delivery, Jet